![](/images/unavailable1000x562.png)
![](https://image.tmdb.org/t/p/w200/llduyHzeMiSYxV9HR1x1m1tConv.jpg)
The electrification of the London Midland Region main line between London, Manchester and Liverpool at 25KV AC, using overhead wires and drawing supply from the National Grid, was a major undertaking involving civil, electrical, mechanical and signal engineering of a complex and advanced nature. This film depicts some aspects of the problems involved and of the unprecedented operations which were carried out.